|
Backed by a 40 year
history of providing
exemplary
geotechnical
services all over
the world, we at
Fugro Nigeria Limited have
expanded our
facilities and staff
to offer services
for the complex
environmental issues
now facing our
industrial clients.
We carryout phase I
and phase II
Environmental Site
Assessment using DPR,
ASTM and
International
standards to obtain
a complete picture
of soil
contamination,
characteristics of
contaminants and
their sub surface
spread.
Environmental Site
Assessment performed
in phaseI provides a
general appraisal of
source, past history
and possible level
of contaminants and
gives protection
against unknown
presence of
hazardous waste or
chemicals.
Site assessment
performed in phase
II assess, dictates
and verifies the
presence of
hazardous chemicals
or wastes. This
assessment is
represented in a 3D
contour of
contaminant plume
Underground Storage
Tank
Fugro Nigeria Limited provides underground
storage tank
compliance
assessment, leakage
detection and
contaminant
remediation. We
measure soil
corrosivity and
vapour survey to
assess underground
tank leakage
contamination to
soil and
groundwater.
|